ERECTION

During erection, precast concrete elements are set into position where dowel bars are projecting either from foundation or lower precast concrete elements. NMB SPLICE-SLEEVES embedded in the upper precast elements receive those dowel bars. The wide (field) ends of the sleeves are designed to provide tolerances of ± 5/16" (± 8mm) for #5 & 6 sleeves, and up to ±1/2" (± 12. 5mm) for the larger sleeves to accommodate bar misalignment. The precast elements are temporarily braced while the grout cures in the sleeves.

GROUTING

For PRE GROUT applications, the SS MORTAR grout is simply poured into the sleeve and consolidated before the next precast member is set in position.

For POST GROUT applications, the grout is pumped into the sleeve by means of a hand operated pump. With the Post Grout system, grouting operations can be performed anytime after bracing and do not interfere with erection progress.

For Horizontal applications, the sleeves are set before the cast-in place closure pour. The open end tolerance accomodates bar misalignment to facilitate installation. Grout is pumped by hand operated pump.

Economy of crane and erection crew time can be improved because: 

In total, NMB SPLICE-SLEEVE contributes to speed of construction.

Prefabrication --- Erection --- Grouting